### Step 1: Preparing the Equipment.
- Ensure you have all the necessary tools and equipment as mentioned in the "Ultimate Guide to Downlead Clamp for OPGW Installation".
- Check the condition of the downlead clamp and OPGW cable to make sure they are in good working order.
### Step 2: Installing the Downlead Clamp.
1. Identify the suitable location on the transmission tower for installing the downlead clamp.
2. Secure the downlead clamp to the tower using the appropriate hardware.
3. Make sure the clamp is securely fastened and can support the weight of the OPGW cable.
### Step 3: Attaching the OPGW Cable.
1. Carefully lower the OPGW cable down to the ground from the helicopter or other lifting equipment.
2. Connect the OPGW cable to the downlead clamp using the recommended attachment method.
3. Double-check the connection to ensure it is secure and properly aligned.
### Step 4: Testing and Finalizing Installation.
1. Perform a tension test on the OPGW cable to ensure it is properly secured to the downlead clamp.
2. Test the electrical conductivity of the clamp to ensure a strong and consistent connection.
3. Conduct a visual inspection of the entire installation to verify everything is in order and all safety measures have been followed.